Home
Product Categories
Multifunctional partial discharge detector
Portable Partial Discharge Detection, Diagnosis, and Location Instrument
Transformer (Reactor) State Comprehensive Monitoring Device
Intelligent Online Monitoring System for High-Voltage Bushing Condition
GIL/GIS Partial Discharge Online Monitoring System
Switch cabinet multi-state integrated online monitoring system
Cable and Tunnel Integrated Online Monitoring Device
Cable Fault Early Warning and Precise Location System
Generator Partial Discharge Online Monitoring System
Power IoT Status Monitoring Series
Success stories
News and Information
About Us
EN
ZH_CN
Home
Product Categories
Multifunctional partial discharge detector
Portable Partial Discharge Detection, Diagnosis, and Location Instrument
Transformer (Reactor) State Comprehensive Monitoring Device
Intelligent Online Monitoring System for High-Voltage Bushing Condition
GIL/GIS Partial Discharge Online Monitoring System
Switch cabinet multi-state integrated online monitoring system
Cable and Tunnel Integrated Online Monitoring Device
Cable Fault Early Warning and Precise Location System
Generator Partial Discharge Online Monitoring System
Power IoT Status Monitoring Series
Success stories
News and Information
About Us
EN
ZH_CN
News and Information
Home
News and Information
2026-09-11
户外变电站防干扰需求高 局部放
步入2026年,户外高压设备绝缘早期预警的刚性需求进一步凸显,西北戈壁、西南山区这类复杂环境下的变电站…
More
2026-09-11
新建市政隧道配电预警卡验收怎
最近跟进了一个新建市政隧道配电预警验收的细节,卡壳点不是设备硬件参数不达标,是现场验收找不到贴合市…
More
2026-09-10
选适合高空作业的轻量局放定位
上周蹲守国家电网西北区域10kV带电作业实操比武现场,有3组铁塔局放定位考核组耗时超标准近2倍——他们说带…
More
2026-09-10
生产线电机莫名停摆断产 部署工
上个月帮一家大型机械制造公司的冲压车间做设备升级复盘,刚进场就碰到负责人急得冒汗:一条3000吨级的连…
More
2026-09-10
电机检修凭经验漏判局放 部署工
近期调研西北工矿企业时发现,超42%的连续生产型厂区仅靠季度或年度拆解绝缘检测判断电机状态,中间漏判早…
More
2026-09-10
隧道供电设备易存早期隐忧 别跳
隧道内湿度波动大、粉尘易附着在绝缘表面,地铁供电设备的早期绝缘故障很难靠肉眼或常规巡检发现,验收地…
More
6
7
8
9
10
11
12
13
14