Home
Product Categories
Multifunctional partial discharge detector
Portable Partial Discharge Detection, Diagnosis, and Location Instrument
Transformer (Reactor) State Comprehensive Monitoring Device
Intelligent Online Monitoring System for High-Voltage Bushing Condition
GIL/GIS Partial Discharge Online Monitoring System
Switch cabinet multi-state integrated online monitoring system
Cable and Tunnel Integrated Online Monitoring Device
Cable Fault Early Warning and Precise Location System
Generator Partial Discharge Online Monitoring System
Power IoT Status Monitoring Series
Success stories
News and Information
About Us
EN
ZH_CN
Home
Product Categories
Multifunctional partial discharge detector
Portable Partial Discharge Detection, Diagnosis, and Location Instrument
Transformer (Reactor) State Comprehensive Monitoring Device
Intelligent Online Monitoring System for High-Voltage Bushing Condition
GIL/GIS Partial Discharge Online Monitoring System
Switch cabinet multi-state integrated online monitoring system
Cable and Tunnel Integrated Online Monitoring Device
Cable Fault Early Warning and Precise Location System
Generator Partial Discharge Online Monitoring System
Power IoT Status Monitoring Series
Success stories
News and Information
About Us
EN
ZH_CN
Success stories
Home
Success stories
Guangxi 800kV converter station GIS partial discharge...
To further expand the application scenarios of the online monitoring system for high-voltage capacitors and enhance the partial discharge monitoring capabilities of core equipment in UHV converter stations, the operation and maintenance team...
Switch cabinet local online monitoring system is now...
Main monitoring equipment: HMJ1010-WAT Smart Three-in-One Sensor Physical Image: HMJ1010-WAT Smart Three-in-One Sensor Physical Image Technical...
Gansu 10kV Cable Partial Discharge Live Detection
On May 9, 2021, during live testing of a 10kV cable in a certain area of Gansu, abnormal partial discharge was found in the Bianjiang 142 circuit breaker cabinet. During the field testing process...
Hubei Power Plant 220kV Voltage-Boosting Station Partial Discharge...
Project Details: A total of one concentrator and three high-frequency current sensors were installed for this project. On February 23, 2024, the high-frequency current detection results were abnormal, at…
High-voltage capacitor online monitoring system conclusion...
I. System Core Functions and Overall Architecture The core function of this high-voltage capacitor online monitoring system is to monitor the voltage and current parameters of high-voltage capacitors.
Guangxi 110kV Substation Switchgear Partial Discharge
The project has installed a total of 23 three-in-one partial discharge sensors. On June 20, 2020, intelligent three-in-one sensors were installed on the 316 switchgear of a certain line and the 308 switchgear of the 1-1C capacitor...
Power plant 220kV booster station partial discharge monitoring...
The project installed one concentrator and three high-frequency current sensors. On January 12, 2024, the high-frequency current detection results were abnormal, and in the spectral detection mode...
Partial Discharge Temperature Measurement Project for a Power Substation in Jiangxi
I. Project Background and Objectives With the in-depth advancement of smart grid construction, traditional substation operation and maintenance models face significant challenges. Relying on manual patrols...